we got a nice breeze throughout the building



All of the antiquated existing windows and the bastardized window hole fillers have been removed, which promotes a great breeze traveling through the building. The concrete has also been poured to make the flooring level throughout. Things have been running about as smooth as a square wheel recently, though as we move forward it looks as if our progress is going rage like a well lubed machine. We should have new windows and doors installed within 2 weeks and the outside concrete will also be poured in that timeframe. Upon completion of these steps, the eifs and stone exterior application will begin and also the rest of the plumbing and electrical rough-in.